佳工机电网 在线工博会 我的佳工网 手机版 English
关键字  
  选择展区 >>
您的位置: 首页 > 电子/通讯/办公文具展区 > 电子工业设备展厅 > 产品库 > 产品介绍 新闻 文章 会展 人才 帮助 | 注册 登录  
电子工业设备展厅
 请选择展区



关键字  
Allwin21 半导体技术发展有限公司 http://www.allwin21.com
首页 | 公司介绍 | 产品与服务 | 企业新闻 | 联系方式
升级型等离子干法去胶打胶扫底膜机Branson/IPC 30
Branson/IPC 3000 single wafer downstream stripper
升级型等离子干法去胶打胶扫底膜机Branson/IPC 3000_Allwin21
1. GENERAL DESCRIPTION

1. THE BRANSON IS A BARREL PLASMA ETCHER THAT USES OXYGEN TO ETCH ORGANIC FILMS AND RESIDUES SUCH AS PHOTORESIST IN A PROCESS COMMONLY REFERRED TO AS "DE-SCUMMING."
2. DURING A NORMAL RUN FOR THE BRANSON BARREL ETCHER, THE CHAMBER IS EVACUATED TO UNDER 0.5 TORR PRESSURE. A REGULATED FLOW OF OXYGEN GAS IS INTRODUCED INTO THE CHAMBER AND RF ENERGY IS APPLIED TO THE CHAMBER COILS, WHICH CREATES AN OXYGEN PLASMA WHICH DOES THE ETCHING. THE OXYGEN IONS IN THE PLASMA REACT WITH ORGANICS, SUCH AS PHOTORESIST, OXIDIZING OR DESCUMMING THE COMPOUNDS OFF OF THE SURFACE. THE OXIDIZED ORGANICS ARE PUMPED OUT OF THE BRANSON BARREL ETCHER’S CHAMBER AS EXHAUST GAS.
2. OPERATING INSTRUCTIONS

1. TURNING ON THE NECESSARY EQUIPMENT
1. 1. MAKE SURE THE HOUSE NITROGEN IS ON.
2. 2. THE OXYGEN TANK IS LOCATED IN THE BACK PUMP ROOM. TURN IT ON WITH THE VALVE ON THE TOP OF THE CYLINDER.
3. 3. THE VACUUM PUMP FOR THE BRANSON CAN BE SWITCHED ON AND OFF WITH THE SWITCH BOX MOUNTED ON THE WALL TO THE LEFT OF THE BRANSON. MAKE SURE NO ONE USES THE PE2 WHILE YOU ARE USING THE BRANSON - THEY USE THE SAME VACUUM PUMP. (THE VACUUM PUMP FOR THE BRANSON IS THE FOURTH MACHINE ON THE RIGHT WHEN YOU ENTER THE PUMP ROOM.)
1.
4. 4. MAKE SURE ALL POWER SWITCHES ARE IN THE "OFF" POSITION AND THE RF POWER TURNED COUNTER-CLOCKWISE.
5. 5. THE "MANUAL/AUTO" SWITCH SHOULD BE IN THE MANUAL POSITION.
6. 6. THE "VACUUM" AND "PURGE" SWITCH SHOULD BE IN THE AUTO (DOWN) POSITION.
7. 5. TURN ON THE "AC POWER" SWITCH ON THE POWER SUPPLY BELOW THE TABLE. MAKE SURE THE "READY" LIGHT ON THE GENERATOR MUST BE ILLUMINATED FOR OPERATION. THIS CAN TAKE UP TO THREE MINUTES.
1.
8. 6. TURN ON THE "AC" SWITCH IN THE LOWER-LEFT CORNER OF THE CONTROL BOX.
9. 1. TURN ON THE NITROGEN TO VENT THE CHAMBER WITH THE "PURGE" SWITCH.
10. 2. DO NOT FORCE THE DOOR OPEN! IT SHOULD OPEN EASILY WHEN THE PRESSURE HAS EQUALIZED.
11. 3. TURN THE "PURGE" SWITCH TO AUTO (DOWN) AND LOAD YOUR WAFERS INTO THE BOAT.
12. 4. CLOSE THE DOOR AND TURN ON THE "VACUUM" SWITCH.
2. MANUAL RUN
1. NOTE - IN MANUAL MODE, THE TIMER IS DISABLED!
2. 1. AFTER LESS THAN A MINUTE OF PUMPING, THE PRESSURE ON THE TORRMETER SHOULD BE LESS THAN 0.5 TORR.
3. 2. TURN ON THE "GAS 1" (OXYGEN) SWITCH TO START THE OXYGEN FLOWING. USE THE VALVE ON TOP TO ADJUST PRESSURE. CAUTION: DO NOT USE THE FLOW ADJUST NEEDLE VALVES TO COMPLETELY TURN OFF THE GAS FLOW, IT MAY PERMANENTLY DAMAGE THE VALVE.
4. 3. TURN ON THE "RF POWER" SWITCH. AFTER 10 SECONDS, THE RF WILL ACTUALLY TURN ON, AND THE NEEDLE ON THE RF POWER GAUGE WILL RISE.
5. 4. MAKE SURE THE SWITCH UNDER THE RF GAUGE IS IN THE "FWD" (UP) POSITION. USE THE KNOB TO SET THE POWER TO 200 WATTS. WARNING!!! DO NOT SET THE POWER ABOVE 300 WATTS!
6. 5. WHEN FINISHED, TURN OFF THE "RF" AND "GAS" SWITCHES.
3. VENTING THE CHAMBER
1. 1. AFTER FINISHING A PROCESS, WAIT FOR THE VACUUM TO PUMP DOWN TO UNDER 0.5 TORR.
2. 2. TURN OFF THE "VACUUM" SWITCH.
3. 3. TURN ON THE "PURGE" SWITCH.
4. 4. TURN OFF THE "PURGE" SWITCH WHEN THE CHAMBER IS AT ATMOSPHERIC PRESSURE AND REMOVE YOUR WAFERS.
4. AUTO RUN
1. WITH AN AUTO RUN, THE MACHINE TURNS OFF THE POWER AND THE GAS WHEN THE TIMER RUNS OUT.
2. YOU MUST HAVE PROGRAMS READY TO GO; THESE HAVE NOT BEEN PROVIDED. FOR PLASMA ETCHING OR CLEANING WAFERS, RUNNING THE MACHINE IN MANUAL MODE IS MUCH EASIER.
5. SHUTTING DOWN THE BRANSON
1. 1. TURN ON THE "VACUUM" SWITCH AND PUMP THE CHAMBER DOWN TO UNDER 0.1 TORR.
2. 2. TURN OFF THE "VACUUM" SWITCH.
3. 3. TURN OFF THE "AC" SWITCH ON THE CONTROL BOX AND THE "AC POWER" SWITCH ON THE POWER SUPPLY BELOW THE TABLE.
4. 4. TURN OFF THE OXYGEN IN THE BACK AND THE VACUUM PUMP.
5. 5. IF YOU ARE THE LAST ONE TO LEAVE THE CLEANROOM AT NIGHT, SHUT OFF THE HOUSE VACUUM AND THE NITROGEN AS WELL.
6. ETCH RATES
1. 1. AZ 3330 - 46 NM/MIN 200 W, 100 O2 FLOW
2. 2. AZ 2020 - 62.8 NM/MIN 200 W, 100 O2 FLOW
3. 3. SU 8 - 56 NM/MIN 200 W, 100 O2 FLOW
本公司是一家总部设在美国硅谷的专业半导体设备与技术服务公司,可提供全新或翻新的Allwin21 AG 610 快速退火系统及其备品备件,专业 的技术团队、严格的 质量检验系统,和 快速及时良好的售后服务,已使我公司在客户中取得良好的信誉。

参考价格:0
公司其它产品:

Perkin-Elmer Sputtering Deposition
保护气氛热处理炉(快速退火炉)-AG Associates Heatpulse
等离子去胶机、扫底膜 、刻蚀半导体设备
快速退火炉(保护气氛热处理炉)-AG Associates Heatpulse
高真空磁控溅射 半导体设备
Allwin21 半导体技术发展有限公司
地址: 3251 Leonard Court Santa Clara,CA 95054
电话: 请点击此处与厂家联系
反馈信息 查看本类产品求购信息 论坛
我要求购:
姓名 电话
E-mail
公司
分类 求购 意见/建议
留言
留言不能少于8个字符,广告性质的留言将被删除。

对 电子工业设备 有何见解?请到 电子工业设备论坛 畅所欲言吧!





网站简介 | 企业会员服务 | 广告服务 | 服务条款 | English | Showsbee | 会员登录  
© 1999-2024 newmaker.com. 佳工机电网·嘉工科技